欧美一级片在线观看-91视频大全-国产一区二区在线免费观看-免费成人电影在线观看-午夜伦理影院-日韩h视频-手机在线观看毛片-极品三级-99视频在线看-性高潮网站-免费高清视频在线观看-中文字幕乱码在线观看-亚洲国产精品区-国产三级中文字幕-日韩免费久久

Mine Engineering

Mine Engineering

Home > SERVICES > Engineering Solution > Mine Engineering

Jinchuan Nickel Mine
DATE:15 Nov 2017 瀏覽次數(shù):1
+ . -

It is a rare high stress super-large metal deposit with difficulty in mining around the world, and is divided into 4 major mining areas during the geological survey. Mechanical underhand drift consolidated cut-and-fill method is adopted and large equipment including dual hydraulic drill jambo and 6m³ scraper are used. The annual production capacity in Mining Area II reaches 4 million t. The application of processes and techniques such as combined bolt-shotcrete-net-cable support system, rod milling high concentration consolidated filling technique, paste filling technique, improved ventilation system, adjustment of stoping order of drifts enhanced the mining efficiency and resource recovery, with rich experience accumulated for metal deposits where ore rocks are unstable in the high stress area.

The concentrator is composed for primary beneficiation plant, secondary beneficiation plant, tertiary beneficiation plant, concentrate plant and tailings plant, with a total production capacity of 29,000 t/d. The production process of the concentrator is two-stage crushing with one closed circuit, two-stage grinding and two-stage separation cleaning, two-stage dewatering of thickening and filtering. Produced concentrate will be fed into flash smelting and top-blowing smelting systems of the smelter.